Reorder Point Formula in Excel With a Historical Backtest
Reorder point, Inventory, Excel formulas
Use this reorder point formula in Excel to decide when to place an order. In the sample, a four-day lead time gives a threshold of 344 units and triggers an order on March 3. At six days the threshold rises to 478 units and the order moves to March 1. Both policies use the same recorded sales.
Prepare one row per SKU and day
Start with a transaction export that has a date, SKU, and quantity. Remove the time portion from the transaction date so all activity on one day groups together. Classify sales and cancellations, then build the sales PivotTable with dates in Rows, SKUs in Columns, and Sum of Quantity in Values. Put the result against a calendar with every date included. Keep cancellation quantities separately so the average follows recorded sales.
The example uses real 2011 transactions from UCI Online Retail. To follow along, unpack the archive and open Online Retail.xlsx. Filter InvoiceDate to February 1–March 28, 2011 and StockCode to 85123A, 71053, and 22086. Count sales from positive Quantity and UnitPrice values and InvoiceNo values without the C cancellation prefix. Keep cancellation units separately. Calendar dates without transactions contribute zero recorded sales. Whether the item was in stock on those dates remains unknown. Download Online Retail ZIP · UCI data dictionary and license
Set the reorder point in Excel
Put the 56 calendar dates in Daily sales column A, beginning at A2. Put the T-light holder sales in column B. Calculate average daily sales using the first four complete weeks. =AVERAGE('Daily sales'!B2:B29) uses all 28 February days, including zeros. The 1,877 recorded units give an average of about 67.04 units per day.
On Parameters, enter lead days in C6, safety-stock units in D6, opening-stock units in E6, order-lot units in F6, and the daily average in G6. In H6, enter =ROUNDUP(G6*C6+D6,0). With four days and 75 safety-stock units, it returns 344. The same formula gives 478 at six days. Round after multiplication so intermediate rounding does not change the result.
Replay the next 28 days
Start March 1 with 500 units and no pending orders or backlog. The workbook uses an order lot of 400. These are adjustable teaching inputs. At the start of the day, receive any orders due. Use available units to fulfill the opening backlog and that day’s demand. At closing, calculate the inventory position as closing stock + units already on order − closing backlog. Place a new order if that number is at or below the reorder point.
On T-light 4 days, set A6 to the date in Daily sales A30 and B6 to its sales in B30. Repeat through row 33 using the next date and sale cell on each row. Initialize C6 with the opening stock in Parameters E6. Enter zero in D6, E6, and I6 because the example has no opening arrivals, backlog, or open orders. For F6–H6 and J6–M6, use the calculation below with row 6 in place of row 7. Enter the row 7 formulas and fill down through row 33.
| Column | Calculation for row 7 |
|---|---|
| C · Opening stock | =G6 |
| D · Arrived | =SUMIF($M$6:M6,A7,$L$6:L6) |
| E · Opening backlog | =H6 |
| F · Fulfilled | =MIN(C7+D7,E7+B7) |
| G · Closing stock | =C7+D7-F7 |
| H · Closing backlog | =E7+B7-F7 |
| I · Units already on order | =I6+L6-D7 |
| J · Inventory position | =G7+I7-H7 |
| K · Reorder point | =Parameters!$H$6 |
| L · Order quantity | =IF(J7<=K7,Parameters!$F$6,0) |
| M · Due date | =IF(L7=0,"",A7+Parameters!$C$6) |
Check two consecutive days by hand
March 2 closes at 381 units with no backlog and nothing on order. Since 381 is above 344, the policy leaves the order quantity at zero. On March 3, 96 more recorded sales bring the position to 285. That triggers a 400-unit order due on March 7. Copying the setup to the six-day scenario moves the first order two days earlier while keeping that arrival on March 7.

March 1–28 replay. Daily sales are recorded. Inventory, lead time, order quantities, and receipts follow the two simulated policies.
To chart the example in Excel, select the date column and the two series Inventory position and Reorder point, then choose Insert → Line. Check the spreadsheet with =COUNTIF(H6:H33,">0") to count days that end with backlog. The four-day T-light example has zero, the lantern example has six, and the paper cup example has eight. Keep the training dates fixed when you compare lead times or safety-stock settings.
Give DataForest the inputs and this prompt. “Use February sales to calculate each SKU’s reorder point, then replay March day by day with my lead time, opening stock and order lot. Show the first order date and days with backlog.”